Is your profit margin shattering along with your glass?
For Glass Processing Managers, the sound of a "pop" in the tempering furnace cooling zone often starts with a micro-scratch during transport. Stop paying for "shipping air" on return trips and eliminate edge shelling caused by inferior dunnage. The Zmgrack system is engineered to secure Foldable A-Frame Glass Rack logistics from the cutting line to the construction site.
In the glass supply chain, the most expensive cargo you haul is often air. Traditional welded A-frames demand the same truck space returning empty as they do when fully loaded with insulated glass units (IGUs). This inefficiency bleeds cash flow, especially for long-haul transport or export scenarios.
Fig 1. High-density stacking capabilities allow for a 5:1 volume reduction on return trips.
The Collapsible Glass Stillage solves this by utilizing a heavy-duty hinge and pin system. Once the glass is offloaded at the glazing site by a spider crane, the rack folds flat. You can stack up to 60 units in a single 40HQ container or consolidate five truckloads of empty returns into one. This isn't just storage; it's a direct recovery of logistics budget.
A common nightmare in summer logistics: The temperature inside a shipping container hits 60°C. The industrial glue on your competitor's rack softens, the rubber pads slide off, and your premium double-silver Low-E glass grinds directly against bare steel. The result is instant rejection at the job site due to coating scratches or edge shelling.
Fig 2. Steel-cored rubber strips secured with self-threading pins ensure zero metal-to-glass contact.
We abandoned adhesives entirely. Our Heavy-duty glass transport rack features rubber strips with an internal steel core, mechanically anchored to the Q235 frame using self-threading pins. This physical anchor withstands the shear forces of 1,500kg loads and extreme temperature cycles, ensuring the buffer zone between steel and glass remains intact for years, not just months.
Architectural trends are moving toward larger, seamless visuals. If your factory receives an order for 6-meter-long curtain wall units, standard closed-side racks become useless obstacles. You cannot force a 6-meter frame into a 2.2-meter box.
Fig 3. Open-ended geometry supports varying lengths of oversized architectural glass.
The Zmgrack utilizes an open-ended geometry. While the base footprint is a standard 2200mm (optimized for truck width), the lack of side obstructions allows ultra-long flat glass racks to accommodate oversized loads that overhang naturally. This means one fleet of racks can handle standard residential windows today and massive commercial facade elements tomorrow, without requiring custom fabrication.
In a busy loading dock, forklift operators often work under time pressure. A slight misalignment when lifting a 3,000 lb load of glass can shift the center of gravity, causing catastrophic tipping. To mitigate this OSHA risk, our racks feature integrated, full-depth forklift channels.
Fig 4. Standardized forklift channels prevent operator error and ensure balanced lifting.
These channels act as a physical "fail-safe," forcing the fork tines to align perfectly with the rack's center of gravity before lifting occurs. Combined with a 1500kg static load capacity tested against Heavy-duty glass transport rack standards, this ensures that the transition from factory floor to flatbed truck is smooth and accident-free.
| Feature | Wooden Crates (End Caps) | Welded Steel A-Frames | Zmgrack Foldable System |
|---|---|---|---|
| Durability | Single-use / Rot & Warp risk | High, but welds may crack | 15+ Years (Hot-dip Galvanized) |
| Return Logistics | Disposal cost (Waste) | 1:1 (Pay for empty air) | 5:1 Compression Ratio |
| Glass Protection | Poor (Stress risers possible) | Variable (Glue failure risk) | Mechanically Fixed Rubber |
| Size Flexibility | Fixed to specific batch | Restricted by frame size | Open-ended (Infinite Length) |
A: Yes. The Zmgrack is engineered with Q235 carbon steel to support a static load capacity of 1,500kg (approx. 3,300 lbs), making it suitable for heavy laminated sheets or dense stacks of tempered glass.
A: No. We use specially formulated industrial rubber that is non-marking and chemically stable. Furthermore, the mechanical fixing method eliminates the need for adhesives that could migrate onto the glass surface under heat.
A: For international logistics, a 40HQ container can accommodate up to 60 sets of our folded Demountable A-Frame Racks, maximizing your freight value.
A: Absolutely. As a direct manufacturer, we can adjust the center distance and dimensions of the forklift entrance to match your specific fleet, whether you use standard counterbalanced trucks or side-loaders.
A: Yes. We offer a Hot-Dip Galvanized surface treatment option which provides metallurgical bonding protection against salt spray and humidity, significantly extending service life in harsh environments compared to standard powder coating.