Fixed Vertical Pipe Storage Rack Technical Solution: 1,000 kg per Rack, 8-Tier Design Target
derack
Technical solution for a fixed vertical pipe storage rack: 250 mm spacer pitch, 1,000 kg dynamic load per rack, 8-tier stacking design target and electrostatic powder coating.
Fixed Vertical Pipe Storage Rack Technical Solution: 1,000 kg per Rack, 8-Tier Design Target
A customer requirement converted from a plug-in stackable rack into a fixed frame: pipes held in spacer slots at 250 mm pitch, 1,000 kg dynamic load per rack, 8-tier stacking design target and electrostatic powder coating, moved by forklift.

Customer Requirement Analysis
The customer needs the plug-in type stackable rack converted into a fixed, non-detachable form.
The rack is fitted with pipe spacer bars at a spacing of 250 mm.
Each single rack carries a load of 1,000 kg.
A forklift is required to move the racks.
Surface treatment: electrostatic powder coating.

Requirement Parameter Table
| No. | Item | Parameter Value | Remarks |
|---|---|---|---|
| 1 | Rack frame dimensions | Reasonably designed according to the spacer distance | |
| 2 | Rack dynamic load | 1,000 kg | |
| 3 | Number of rack stacking tiers | Design target: 8 tiers | |
| 4 | Surface treatment | Electrostatic powder coating |
Technical Solution Description
Based on the customer's requirements, we have developed the following solution.

This is the overall appearance; the material specifications and basic dimensions are visible in the drawing. The rack's own weight is 47 kg.

The clear gap between each spacer is 250 mm.

We have fitted two cross braces, as shown in the figure. The yellow arrows indicate the fork entry direction. If the fork tines cannot pass completely through the rack, the blue cross braces support the whole rack and prevent it from tilting.

A plastic cap is fitted on top of every post to prevent injury to people and damage to goods.

The racks can be stacked to make use of the space above. We recommend stacking 7 tiers when loaded and 10 tiers when empty.
Packing and Loading Plan
Packing reference:

The products are packed with stretch film plus strapping bands. This method does not add extra packing cost, but it cannot fully guarantee that the paint film will not be damaged by contact between products during transport. A more reliable wooden crate packing is also available; the wooden crate is calculated into the product cost at our purchasing price (wooden crate price = CNY 90 / m²).
Items Requiring Further Discussion
We have prepared a preliminary solution design for you. A few detail dimensions differ slightly from your requirements; we can hold an online meeting together to discuss their function and see whether further adjustment is needed. We look forward to working through this with you.
Share your pipe diameter and length, the load per rack, the stacking height you need and your forklift handling method. We will confirm the spacer pitch, frame dimensions, surface treatment and packing for your project. Request a rack layout and quotation