🏭 Steelpallet · Factory Direct · OEM Available

Vertical Pipe Storage Rack for 6 m Plastic and Steel Pipes
derack

Stackable vertical pipe rack for 6 m plastic and steel pipes: 1150 × 950 mm internal frame, 2000 kg per rack, three-tier stacking, forklift handling, 24 units per 40ft HC.

100%
Steel Quality
Heavy
Duty Rating
Custom
Sizes Built
Vertical Pipe Storage Rack for 6 m Plastic and Steel Pipes
Technical Solution

Vertical Pipe Storage Rack for 6 m Plastic and Steel Pipes

A stackable vertical pipe racking solution for storing 6 m pipes and conduit: 1150 × 950 mm internal frame, 2000 kg load per rack, three-tier stacking, forklift loading and unloading, and 24 units per 40ft high cube container.

Request a pipe rack quote

derack technical source image

Customer requirements analysis:

The customer needs to store 6-meter-long plastic pipes and steel pipes.

Internal frame dimensions: 1150 × 950 mm.

The stackable racks can be stacked three tiers high.

Each rack stores 2000 kg of pipe material.

Pipes are put in and taken out using a forklift.

Technical solution description

The preliminary design form of the pipe rack is shown in the figure below.

derack technical source image

The external dimensions of the rack are 5520 × 1330 × 1220 mm, with a self-weight of 260 kg.

derack technical source image
derack technical source image
derack technical source image

Effect after loading, shown here with 6 m long pipes

derack technical source image
derack technical source image

Effect of three-tier stacking

derack technical source image

Effect of empty stacking

Packaging and container loading plan

A standard 40ft high cube container holds 24 units (18 placed flat and 6 placed upright).

Packaging reference style:

derack technical source image
derack technical source image
derack technical source image

The product is packed with stretch film plus strapping. This method does not create additional packaging costs, but it cannot fully prevent the surface paint film from being damaged by collisions between products during transport. A more reliable wooden crate packaging can also be selected; the cost of the wooden crate is calculated into the product cost at our purchase price. (Wooden crate price = CNY 90/㎡)

Implementation plan and lead time

The salesperson can provide this content when the customer has specific quantity and production lead time requirements.

After-sales service plan

None

Risk assessment

When the forklift enters and lifts the forks, operate at a uniform speed; do not fork aggressively, so as to avoid damage to the product and any effect on its use.

Regularly check the base, uprights and other components for bending, deformation or broken welds, to avoid danger caused by problems in the rack components.

During static stacking, the operator must confirm that the feet of the upper rack have indeed rested completely on the uprights of the lower rack before releasing the load. This avoids the risk of a toppling stack caused by improper stacking.

Tell us your pipe length, diameter range, load per rack, stacking height and handling equipment. Our engineering team will come back with a vertical pipe storage rack arrangement, a packaging and container loading plan, and a delivered price. Request a technical proposal

Request Pricing Details




    Request Quote List

    Your quote request list is empty.

    Request Technical Drawings

    Provide your contact details to request the drawing. If a file is unavailable, our team will contact you.